Deskripsyon
Contractor repairing gas lines removed all the cobblestone in the alley and repaired the excavation with gravel. This section of alley was paved with cobblestones and the cobblestones need to be replaced.
Contractor repairing gas lines removed all the cobblestone in the alley and repaired the excavation with gravel. This section of alley was paved with cobblestones and the cobblestones need to be replaced.
4 Komentos
Kinilala RVA: Customer campaigner (Rehistradong User)
Richmond Dan (Panauhin)
City of Richmond System (Rehistradong User)
City of Richmond System (Rehistradong User)
It's actually behind 3013 Monument, not 3015.